ISTQB CT-TAE (Certified Tester Test Automation Engineer) Exam is a globally recognized certification program designed for software testers who specialize in test automation. Certified Tester Test Automation Engineer certification is ideal for professionals who wish to demonstrate their knowledge and skills in test automation techniques and tools. The CT-TAE certification is suitable for both novice testers who are starting their careers in automation and experienced testers who wish to validate their knowledge.

 

NEW QUESTION # 39
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

  • A. Re-run the test automation suite starting from the 12th test
  • B. Return the database to a consistent state that allows subsequent test to run
  • C. Re-run the test automation suite starting from the 1st test.
  • D. Take a backup of the database in its current state. So It can be analyzed later

Answer: D


NEW QUESTION # 40
Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

  • A. Changing the scripting approach to data-driven scripting
  • B. Implementing keywords with a higher level of granularity
  • C. Changing the wait mechanism to explicit hard-coded waits
  • D. Establishing an error recovery process for TAS and SUT

Answer: C


NEW QUESTION # 41
Consider a TAS that is going to be deployed for the first time. The TAS requires share resources and run it its own test environment. The infrastructure for the TAS has been created along with maintenance procedures. It is very unlikely the TAS will be required to work in other target Environments. There is a high-risk that when the TAS is deployed in its own test environment, a number of existing application will no longer work because of conflicts with the existing shared resources.
Which of the following activities would you expect to be MOST effective at mitigating the risk associated with the first deployment of the TAS?

  • A. Testing the TAS for regressions due to optimization that fix non-functional issues.
  • B. Testing the TAS for ITS ability to run a shared test environment
  • C. Testing the TAS for application compatibility issues in the target environment
  • D. Testing the TAS for its ability to be implemented in other target test environments.

Answer: D


NEW QUESTION # 42
When the SUT provides insight into the behaviour of the system, providing the users the with the status of the various actions performed so that they can check that expected behaviour equals actual behaviour, what is this called?

  • A. Portability.
  • B. Observability.
  • C. Maintainability.
  • D. Controllability.

Answer: B


NEW QUESTION # 43
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?

  • A. Sustainability of the automated environment
  • B. Complexity to automate
  • C. Maturity of the test process
  • D. Frequency of use

Answer: A


NEW QUESTION # 44
You are implementing test automation for a project and you want to be able to generate test cases automatically using a series of test design tools which use a variety of test design techniques such as decision tables, pairwise testing and boundary value analysis.
You also want to generate test data automatically which can then be used by the tests.
Initially these tests will be run manually to verify their correctness and ultimately you want to include them in the test execution tool so that they can run unattended.
Which layer of the gTAA will be used to support the specification of the test cases and preparation of the test data?

  • A. The definition layer
  • B. The adaptation layer
  • C. The execution layer
  • D. The generation layer

Answer: A


NEW QUESTION # 45
You are working on a government system called "Making Tax Digital" or MTD for short. This system is being implemented to stop manual human input error and also to reduce fraudulent behaviour from companies when submitting their tax and VAT returns.
The key concept is that registered companies will need to use government recommended 3rd party software for their accounts and book keeping. These 3rd party applications will have a direct interface into the government's main system for transactions and submissions.
You have been using a test execution tool successfully on the project so far. and have implemented a basic "capture/replay" approach to scripting.
The management have been encouraged with the automation so far, but want the following objectives to be met:
* Test cases added easily
* Reduction in the amount of scripts and script duplication
* Reduction in maintenance costs
Which scripting technique would be MOST suitable in this scenario in order to meet the objectives?

  • A. Keyword-driven scripting
  • B. Structured scripting
  • C. Data-driven scripting
  • D. Linear scripting

Answer: A


NEW QUESTION # 46
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).
What is the BEST recommendation for improving the TAS?

  • A. Implementing keywords with higher level of granularity
  • B. Implementing standard setup and teardown functions at test case level
  • C. Improving the architecture of the application in order to improve its testability
  • D. Adopting a set of standard verification methods for use by all automated tests

Answer: A


NEW QUESTION # 47
Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?

  • A. The code coverage achieved with the automated tests, for each new release of the SUT
  • B. The time it takes to execute all the automated tests, for each new release of the SUT.
  • C. The number of automated tests requiring maintenance, for each new release of the SUT.
  • D. The number of automated tests which fail because of a single software defect, for each new release of the SUT

Answer: D


NEW QUESTION # 48
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

  • A. The ability of the SUT to prevent unauthorized access to its components or data.
  • B. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
  • C. The ability of the SUT to perform its intended function for a specified period of time
  • D. The ability to identify states, outputs, intermediate result and error messages in the SUT

Answer: D


NEW QUESTION # 49
Which of the following statement about the implementation of automated regression testing is FALSE?

  • A. When automating regression tests, the structure of automated tests must always be the same as the corresponding manual tests
  • B. When automating regression tests, consideration should be given to how much time would be saved by automation
  • C. When automating regression tests, the initialization steps set the test preconditions should be automated wherever possible
  • D. When automating regression tests, the corresponding manual tests should have already been executed to verify they operate correctly

Answer: B


NEW QUESTION # 50
Which of the following CORRECTLY describes how automation SHOULD be applied to confirmation testing?

  • A. Confirmation tests can be automated and incorporated into an automated regression suite to show whether defects that were previously fixed reoccur
  • B. A confirmation test should only be automated after it has been run manually
  • C. Confirmation tests are not good candidates for automation as they are not designed to run many times
  • D. Confirmation tests should only be automated if they fail to pass on the first attempt

Answer: A


NEW QUESTION # 51
You are using a gTAA to create a TAS for a project. The TAS is aimed at automatically and executing test cases based on a use-case Modeling approaching that uses UML as a modeling language. All the interaction between TAS and SUT will only be at the API and GUI level.
Which of the following components of the gTAA would you EXCLUDE from the TAS?

  • A. The Command Line Interface (CLI) component of the test adaptation layer
  • B. The test reporting component of the test execution layer.
  • C. The test execution (test engine of the test execution layer
  • D. The Test execution component of the test generation layer

Answer: A


NEW QUESTION # 52
The GUI of a Customer Relationship Management (CRM) application has been delivered through internet Explorer with proprietary Active X and Java controls. This implementation enables rich client capabilities, but specific commercial automation tools are necessary to automate test cases at GUI of functional test cases. This is to demonstrate whether a small set of the commercial are able to properly recognize actions taken by a tester when interacting with GUI of the CRM application.
Which of the following scripting techniques would be MOST suitable in this scenario?

  • A. Structure scripting
  • B. Keyword-driven scripting
  • C. Data-driven scripting
  • D. Linear scripting

Answer: A


NEW QUESTION # 53
Your project is transitioning from manual to automated testing. You have decided to implement a pilot project so that lessons learned can inform future time estimates and schedules.
Which two of the following represent the types of test cases that are MOST suited to a test automation pilot project?
a) High added value test cases that require little effort to automate.
b) Test that are run infrequently as these will be simpler to automate
c) Reliability test cases that can show added value soon
d) Technically challenging test cases to provide the best validation of manual test conversion e) Tests that are least Important to the business as these are safer to trial

  • A. a and b
  • B. c and e
  • C. b and d
  • D. a and c

Answer: D


NEW QUESTION # 54
You are planning the pilot for an in-house developed Test Automation solution (TAS).
Which two of the following would be important steps to take as part of the planning process?
a) Review your organisation's current projects and identify which one would be most suitable to pilot the TAS.
b) Ensure that the developers will provide the necessary commitment for the TAS deployment activities.
c) Run a series of training workshops for new users of the TAS before they are asked to use it.
d) Develop a project plan for the pilot and reserve the necessary budget and resources for its implementation.
e) Ask the developers to provide any missing functionality during the deployment activities.

  • A. a and b
  • B. c and e
  • C. c and d
  • D. b and d

Answer: D


NEW QUESTION # 55
Which of the following success factors for a test automation project is TRUE?

  • A. The test cases to be automated first must always be selected based on the number of times a test will need to be run
  • B. The test cases to be automated must have a high dependency on particular data values
  • C. Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results
  • D. Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite

Answer: D


NEW QUESTION # 56
You have been asked to develop test automation for a legacy system that is going to go through a series of infrastructure migrations. The scripts will be used to verify basic functionality during these infrastructure changes Your Test Analysts have some programming skills and need a solution that is simple and fast.
Maintainability of the scripts is not a consideration because no changes to the software are anticipated.
Which of the following is the BEST scripting approach in this situation?

  • A. Capture-replay scripting
  • B. Model-Based scripting
  • C. Structured scripting
  • D. Linear scripting

Answer: A


NEW QUESTION # 57
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.
Which of the following statements is TRUE?

  • A. The pilot project should have been critical so that maximum benefits were delivered
  • B. The target defined for the project was inappropriate, because the automation regime for the automated tests at the end of the pilot is not yet mature.
  • C. The approach used for deployed this tool is aligned to the standard success factor for deployment
  • D. The test process should be radically changed to gain additional benefits from using the tool.

Answer: C


NEW QUESTION # 58
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?

  • A. The automated test cases will not contain the expected result
  • B. The process of configuring the TAS will be error-phone due to manual intervention
  • C. The connectivity from the TAS to the dedicated test interfaces will not work
  • D. False alarms, that are unlikely to occur in the real world, will be observed during testing

Answer: D


NEW QUESTION # 59
New features have been added for the current release of a SUT.
Which action would NOT be appropriate for the TAE to perform when evaluating the impact on the TAS?

  • A. Evaluate compatibility with existing test tools and, where necessary, identify alternative solutions.
  • B. Run existing automated tests against the updated SUT to verify and record any changes to their correct operation.
  • C. Review existing keywords to see if they need to be modified.
  • D. Gather feedback from the Business Analysts to determine if the current TAS will meet the needs of the new features.

Answer: D


NEW QUESTION # 60
Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.
Which of the following is NOT a relevant check for achieving your goal in this scenario?

  • A. Checking whether all the test cases contain the expected results
  • B. Checking whether the post condition have been fulfilled for all the test cases
  • C. Checking whether all the test cases produce repeatable outcomes
  • D. Checking whether the loading of the TAS is repeatable in the SUT environment

Answer: C


NEW QUESTION # 61
Your functional regression test automation suite ran successfully for the first two sprints and no failures were encountered during the runs. The automation suite records the status of each test case as either 'pass' or 'fail' and has excellent recovery capability built in.
For the third sprint, the TAS log reported several test cases with a status of 'fail'. You investigated each test case and found that most failures were due to a defect in one of the keyword scripts, rather than in the SUT. For those where the failure was in the SUT, defect reports were raised but several were returned by the developers asking for more information to enable them to reproduce the problem.
Which additional log items SHOULD you add to the TAS that would BEST improve failure analysis and defect reporting for future sprints?
a) Dynamic measurement information about the SUT.
b) A status of TAS error', in additional to pass' and 'fail', for each test case.
c) Use of a colour coding scheme so that 'pass' is in red and fail' is in green.
d) A counter to determine how many times each test case has been executed.
e) System configuration information including software/firmware and operating system versions.
f) A copy of the source code for all Keyword scripts executed.

  • A. a and b
  • B. a and c
  • C. d and e
  • D. b and e

Answer: C


NEW QUESTION # 62
You have investigated a new tool which enables the modelling of the SUT and can then generate test cases either manually or automatically. You have convinced your managers that the best way forward is to conduct a pilot project for this tool. You need to select a project to use for the pilot. You have the choice of the following projects:
Project A: A two-year project that is critical to the business and is currently in the requirement phase. This project is for a new e-commerce web site and is mostly being developed "in-house" although the payment system is being developed and delivered by a 3rd party provider.
Project B: A safety critical application for software to drive and park cars.
Project C: An upgrade to an important HR timesheet tracking application that will be available on a desktop and mobile application. This is a 1-month project developed in-house.
Project D The payment system from project A.
Which project would be BEST for the pilot?

  • A. Project D because it is a small part of a larger project and will help show the tool's capabilities.
  • B. Project B because it is a safety critical system and has high visibility.
  • C. Project C because it is a short, low priority project but is important.
  • D. Project A because it is a large project and has high visibility and is in the requirement phase.

Answer: A


NEW QUESTION # 63
Which of the following statements does NOT describe good practice for maintaining the TAS?

  • A. The TAS must consist of components that can be easily replaced without affecting the overall behavior of the TAS itself
  • B. The TAS must be under configuration management, along with the test suite, the testware artefacts and the test environment in which it runs
  • C. The TAS must separate the test scripts from the environment in which it runs and from the associated harnesses and artefacts
  • D. The TAS must run in the development environment because development and programming knowledge are required for its maintainability

Answer: D


NEW QUESTION # 64
......