Pass E_S4HCON2022 Exam Latest Practice Questions Updated on Dec 14, 2023 [Q32-Q54]

Share

Pass E_S4HCON2022 Exam Latest Practice Questions Updated on Dec 14, 2023

SAP E_S4HCON2022 Study Guide Archives 


To pass the SAP E_S4HCON2022 exam, candidates must have a good understanding of the SAP S/4HANA conversion process, including the different deployment options, system requirements, and prerequisites. They must also be familiar with the SAP Activate methodology and the different phases involved in the migration process. Additionally, candidates must have a good understanding of the data migration process, including the different tools and techniques used to migrate data from legacy systems to SAP S/4HANA.


SAP E_S4HCON2022 certification exam is an essential certification for professionals who want to demonstrate their expertise in SAP S/4HANA conversion and system upgrades. It is a globally recognized certification that is recognized by many organizations and companies around the world, and it is considered as the gold standard for professionals who want to work with SAP technologies.

 

NEW QUESTION # 32
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Apply SAP Support Packages.
  • B. Apply an Enhancement Package.
  • C. Perform an SAP S/4HANA conversion including DMO.
  • D. Upgrade the SAP system.
  • E. Use DMO for SUM.

Answer: A,B,D


NEW QUESTION # 33
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check the dump size of the database export on disk.
  • B. Check the log files written in the SUM directory subdirectory abap. subdirectory log
  • C. Check the Charts Control Center in the SUM Ul
  • D. Check logs for jobs starting with RSUPG_SGEN in the SAP system.

Answer: A,B


NEW QUESTION # 34
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

  • A. You need to build up an SI check framework by applying SAP Notes
  • B. The errors from the SI checks must be solved, otherwise. SUM will report an error
  • C. The SI checks are executed in the development system and the results are transported into the subsequent systems
  • D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework

Answer: A,D


NEW QUESTION # 35
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete

Answer: D


NEW QUESTION # 36
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phases EU_IMPORT*
  • B. Phase RUN_RSDBSCPY
  • C. Phases DIFF*
  • D. Phase RUN_RSPTBFIL _ISUTABU
  • E. Phase DOWNCONF_DTTRANS

Answer: A,C,E


NEW QUESTION # 37
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The target database size increases temporarily because of the Shadow Repository.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. The source system is non-Unicode and the target database is a scale-out system.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: C,E


NEW QUESTION # 38
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When upgrading an SAP ECC system with DMO
  • B. When performing an SAP S/4HANA conversion with DMO
  • C. When upgrading an SAP S/4HANA Server system
  • D. When performing an SAP S/4HANA conversion without u DMO

Answer: A,C


NEW QUESTION # 39
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To auto-fill specific fields on selected screens on the SUM UI
  • B. To repeat specific phases during the SUM run
  • C. To skip selected phases during the SUM run
  • D. To make the progress information within SUM UI more accurate

Answer: D


NEW QUESTION # 40
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The target database size increases temporarily because of the Shadow Repository.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. The source system is non-Unicode and the target database is a scale-out system.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: C,E


NEW QUESTION # 41
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The benchmaking option allows you to migration a specified set of tables
  • B. The benchmaking option allows you to repeat the uptime migration
  • C. The repetition option allows you to run the migration without a shadow system
  • D. The repetition option allows you to repeat the complete migration

Answer: A


NEW QUESTION # 42
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • C. By searching for transport requests that are assigned to the project SAP_ADJUST
  • D. By searching for transport requests in the file umodauto.Ist

Answer: D


NEW QUESTION # 43
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

  • A. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
  • B. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
  • C. /ASU/START (Start ASU Toolbox)
  • D. /ASU/SSM (ASU Simple Schedule Manager)

Answer: C


NEW QUESTION # 44
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Extract the SAP HANA client installation archive
  • B. Move the R3trans update archive into the download folder
  • C. Move the stack.xml update file into the download folder
  • D. Extract the SAP HANA database installation archive
  • E. Move the SAPM update archive into the download folder

Answer: A,C,E


NEW QUESTION # 45
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SE80 (Object Navigator)
  • B. ATC (ABAP Test Cockpit)
  • C. SYCM (Simplification Database Content)
  • D. SAT (Runtime Analysis)

Answer: A,B


NEW QUESTION # 46
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Conversion of application tables (PARCONVJJPG)
  • B. Activation of dictionary objects (ACT_UPG)
  • C. Switch to new repository (EU_SWITCH)
  • D. Modification adjustment (SPDD)

Answer: B,D


NEW QUESTION # 47
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 48
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

  • A. Software update
  • B. Conversion
  • C. Migration
  • D. Main import

Answer: B,C


NEW QUESTION # 49
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. A Standalone SAP system with ABAP 7.51 or above
  • B. AA
  • C. An SAP S4HANA 1709 sandbox system

Answer: A,C


NEW QUESTION # 50
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. After SUM has ended
  • B. During the SUM technical downtime
  • C. Before the start of the SUM technical downtime
  • D. During the Execution roadmap step

Answer: B


NEW QUESTION # 51
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

  • A. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs
  • B. You can verify that the content of the download directory matches the stack XML file.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can find the optimal number of parallel H3load processes by monitoring host performance

Answer: A,D


NEW QUESTION # 52
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
  • B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • C. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • D. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.

Answer: B


NEW QUESTION # 53
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Specify the business functions that need to be switched on during the prepare part of SUM.
  • B. Activate the required business functions manually in the production system.
  • C. During conversion, SUM delivers some business functions already activated.
  • D. Import a transport request from the development system that contains the recording of the activation.

Answer: C,D


NEW QUESTION # 54
......

E_S4HCON2022 Questions Prepare with Learning Information: https://www.dumpexam.com/E_S4HCON2022-valid-torrent.html

Download E_S4HCON2022 Mock Test Study Material: https://drive.google.com/open?id=1WukxWi-uH8gZ18a9JCdKAjZra2NmtPLZ